Carpentry and joinery invoice template
A carpentry or joinery invoice should separate workshop time from fitting time, list timber by the metre or cubic metre and mouldings by the linear metre, show ironmongery and finishes as materials, and deduct the materials deposit the customer paid before work started. Download the free Excel template; it totals VAT, deposits and any CIS deduction. Then keep timber merchant and ironmongery receipts by job for your accountant.
On this page
What to put on a carpentry invoice
- Your name or business name and address, and the customer’s name and job address.
- The quote reference and a short description of each piece or room, such as fitted alcove units or skirting.
- Design and measuring time, if you charge for it.
- Workshop time for making and finishing, separate from on-site fitting time.
- Timber by species and length or volume, and mouldings by the linear metre.
- Ironmongery, glue, fixings and finishes as materials.
- Any agreed change, such as an extra shelf or a different finish, on its own line.
- VAT if you are registered, the materials deposit already paid, the balance due and payment terms.
Create it online or in Excel
Fill the yellow cells in the Excel template and it works out the amount due, with any CIS deduction. Or make a PDF with the free invoice generator, which keeps it with your receipts.
Example carpentry invoice
A fictional job in pounds for a business that is not VAT-registered. The template’s first sheet holds this example; the second is blank for your own invoice.
| Item | Amount |
|---|---|
| Site measure and design drawing (labour): 1 visit × £110.00 | £110.00 |
| European oak boards, 27 mm, planed (materials): 32 linear m × £21.00 | £672.00 |
| Make and finish fitted alcove units, workshop time (labour): 22 hours × £45.00 | £990.00 |
| Hinges, shelf pins, glue and hardwax oil (materials): 1 lot × £85.00 | £85.00 |
| Fit units and scribe to wall (labour): 6 hours × £45.00 | £270.00 |
| Supply and fit torus skirting (labour): 18 linear m × £14.00 | £252.00 |
| Subtotal | £2,379.00 |
| Less deposit paid | -£1,000.00 |
| Amount due | £1,379.00 |
Materials deposits, workshop time and changes
- Take a deposit to cover timber and ironmongery before you start bespoke work, and show it as deducted on the final invoice.
- Merchants sell planed and sawn timber by the linear metre and hardwood in bulk by the cubic metre. Quote in the same unit the merchant charges, so the customer can check your line against the merchant’s invoice.
- Separating workshop hours from fitting hours shows the customer where the time went and helps you price the next piece.
- Write up changes agreed on site, such as an extra shelf or a different finish, as their own lines with the agreed price.
- Allow for waste when you quote: knots, splits and cutting losses mean you buy more timber than ends up in the finished piece. Say on the quote whether offcuts stay with you or the customer.
- First and second fix work for a builder is a construction operation, so the builder deducts CIS from your labour. Bespoke furniture made in your workshop and sold to a homeowner is not.
Bookkeeping for carpenters and joiners: what to keep
- Timber and sheet materials: merchant invoices tagged with the job they were cut for, including offcuts you keep for later jobs.
- Ironmongery and finishes: hinges, runners, glue, stains and oils, by job where you can.
- Tools and blades: saw blades, router cutters and sharpening, and larger machines you keep for years.
- Workshop costs: rent, power and dust extraction if you work from a separate workshop.
- Van and travel: fuel and parking for site visits and fitting.
- Insurance: public liability, and cover for tools and the workshop.
Working for a contractor: CIS
When a contractor pays you under the Construction Industry Scheme, they take CIS off your labour lines only, not the materials you bought. The template works it out at 20%, 30% or 0%. Homeowners do not deduct CIS.
Common questions
Should a joiner charge for workshop time and fitting time separately?
Showing them separately makes the invoice easy to check against the quote, and tells you which part of the job took longer than planned.
Should fitted furniture have a deposit?
Most joiners take one before buying timber for bespoke work, often enough to cover materials. Record it when it arrives and deduct it on the final invoice, as the template does.
How do I bill timber on a carpentry invoice?
List it by species with the length or volume, at the price you quoted. Keep the merchant’s invoice as the cost behind it.
Is this carpentry invoice template free?
Yes. Download and reuse it without an account. FigureLane’s invoice generator and 10 document uploads are also free to try, with no card.